











Project: PH (parking garage) Audi T39 3.BA Connection to factory (bridge)
Location: August Horch Strasse 22 | 85055 Ingolstadt | Germany
Facts:
Architect: RPB Rückert
Builder: Audi AG, Goldbeck Ost GmbH
Installation: Bauen mit Glas
Glass safety: VSG 6/6 TVG, 1,52 mm PVB
Substructure: Steel construction on site
Surface: Ral 9007
Product: AL-WALL FLAT-LORS
Special fastening system. Cut on Laser. Sheet metal cutter mounted.
Completion: 2015