Project: Photovoltaic composite system for energy tower in Leonding.
Location: Meixnerkreuzung | Linz, Leonding | Austria
Facts:
Planner: ETECH Schmid & Pachler Elektrotechnik, Linz
Operator: GIWOG, Leonding
Installation: ETECH Schmid u. Pachler Elektrotechnik, Linz
Product: AL-WALL with vandal-proof countersunk screws
Glass safety: 46 laminated safety glass panes 32" x 80", Ertex Solartechnik, Amstetten (A), capacity 8.5 kW
Substructure: Steel Tube construction
Surface: Approx. 818,06 sq. ft.
Product: AL-WALL
Completion: June 2009